Solusi nelusuri

  • Xinjiang Hami 600KWp Miring Tracker

    Xinjiang Hami 600KWp Miring Tracker

    ● Proyek Xinjiang Hami Tilted Tracker ● Kapasitas instalasi: 600KWp ● Jinis sistem tracking: Tilted Tracker ● Lokasi Proyek: Hami ● Wektu konstruksi: Juni 2015
    Waca liyane
  • Xinjiang 8MW Tilted Tracker

    Xinjiang 8MW Tilted Tracker

    ● Proyek Xinjiang 8MWTilted Tracker ● Kapasitas terpasang: 8MWp ● Jinis sistem tracking: Tilted Tracker ● Lokasi Proyek: Xinjiang ● Wektu konstruksi: April 2014
    Waca liyane
  • Datong, Shanxi 2MW Tilted tracker project

    Datong, Shanxi 2MW Tilted tracker project

    ● Shanxi Datong 2MW Tilted tracker ● Kapasitas terpasang: 2MWp ● Tracking system type: Tilted tracker ● Project Location: Datong, Shanxi ● Construction time: April 2015
    Waca liyane
  • Datong, Shanxi 2MW project tracker miring

    Datong, Shanxi 2MW project tracker miring

    ● Proyek pelacak miring Datong, Shanxi 2MW ● Kapasitas terpasang: 2MWp ● Jinis sistem pelacakan: pelacak miring ● Lokasi Proyek: Datong, Shanxi ● Wektu konstruksi: April 2015
    Waca liyane
  • Proyek pelacak miring Hebei Zhangbei 25MW

    Proyek pelacak miring Hebei Zhangbei 25MW

    ● Hebei Zhangbei 25MW tilted tracker ● Kapasitas instalasi: 25MWp ● Jinis sistem tracking: miring tracker ● Lokasi Proyek: Zhangbei ● Wektu konstruksi: Juni 2016
    Waca liyane
  • Proyek pelacak miring Gansu 180KW

    Proyek pelacak miring Gansu 180KW

    ● Gansu 180KW tilt tracker ● Kapasitas instalasi: 180KWp ● Tracking system type: tilt tracker ● Project Location: Gansu ● Construction time: March 2015
    Waca liyane